Buzzard

Date: 
January 2019 to March 2020

Man Hours: 500+

System Hours: 6000 

Technicians: Habitat Supervisor and Habitat Technician

Scope: The Buzzard Platform was extending the fibre optic cable therefore requiring the shutdown of several wellheads. As this is an ATEX Zone 1 area they required a Habitat system to enable hot works to be carried out on the well deck of the platform.

StS provided Weatherford with 6 Habitats over an 14 month period for this project. All hot works had to be completed while the platform was in full production due to the cost involved. The scope was completed without delay which allowed for normal operations to proceed as planned. 

Result: StS personnel worked closely with both Weatherford and CNOOC personnel to ensure everything was working according to plan without any incidents or delays.

Location: 
Buzzard Oil Field - North Sea